ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK MRT (STUDI KASUS GEDUNG MRT HUBUNG JAKARTA PUSAT)
Abstract
Analysis of the application of time management in the MRT project case study of the MRT hubung building in central jakarta so in the discussion of this thesis the point is aimed at the management system used by pt.pp on the mrt building construction project and analyzes what are the obstacles by pt pp by applying time management that has been prepared before the project runs.
Downloads
Download data is not yet available.
Published
2025-08-14
How to Cite
Rahmanto, A., & Ardiansyah, F. (2025). ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK MRT (STUDI KASUS GEDUNG MRT HUBUNG JAKARTA PUSAT). Jurnal Konstruksi Ronggolawe (JKR), 4(1), 7-10. Retrieved from https://utrcepu.ac.id/jurnal/index.php/jkr/article/view/534
Section
Articles

This work is licensed under a Creative Commons Attribution 4.0 International License.


